Chance-Constrained Model for RCPSP with Uncertain Durations

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chance-Constrained Model for RCPSP with Uncertain Durations

Project scheduling with uncertain durations becomes a research focus with the development of uncertainty theory. Most researches concerned aim at minimizing project makespan or project cost according to different decision criterions. However, few works considered resource constraint, which initially appeared in deterministic resource-constrained project scheduling problem (RCPSP) and reflects t...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

Precedence Constraint Posting for the RCPSP with Uncertain, Bounded Durations

The Resource Constrained Project Scheduling Problem is an important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and uncertain activity durations. We adopt a Precedence Constraint Posting approach and add precedence constraints to the original project graph so that all resource conflicts are solved and a consistent assignm...

متن کامل

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Uncertain Chance-constrained Programming Model for Project Scheduling Problem

Project scheduling problem is to determine the schedule of allocating the loans to a project in order to balance the total cost and the completion time of the project under some constraints. This paper considers project scheduling problem in an uncertain environment, of which the duration time of each activity is an uncertain variable. Then uncertain chance-constrained programming model is cons...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Uncertainty Analysis and Applications

سال: 2015

ISSN: 2195-5468

DOI: 10.1186/s40467-015-0034-8