Cognition-Based Delay Analysis to Determine the Average Minimum Time Limit for Wireless Sensor Communications

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Minimum Scheduling Time for Convergecast in Wireless Sensor Networks

We study the scheduling problem for data collection from sensor nodes to the sink node in wireless sensor networks, also referred to as the convergecast problem. The convergecast problem in general network topology has been proven to be NP-hard. In this paper, we propose our heuristic algorithm (finding the minimum scheduling time for convergecast (FMSTC)) for general network topology and evalu...

متن کامل

An Adaptive LEACH-based Clustering Algorithm for Wireless Sensor Networks

LEACH is the most popular clastering algorithm in Wireless Sensor Networks (WSNs). However, it has two main drawbacks, including random selection of cluster heads, and direct communication of cluster heads with the sink. This paper aims to introduce a new centralized cluster-based routing protocol named LEACH-AEC (LEACH with Adaptive Energy Consumption), which guarantees to generate balanced cl...

متن کامل

Hypercube Bivariate-Based Key Management for Wireless Sensor Networks

Wireless sensor networks are composed of very small devices, called sensor nodes,for numerous applications in the environment. In adversarial environments, the securitybecomes a crucial issue in wireless sensor networks (WSNs). There are various securityservices in WSNs such as key management, authentication, and pairwise keyestablishment. Due to some limitations on sensor nodes, the previous k...

متن کامل

a time-series analysis of the demand for life insurance in iran

با توجه به تجزیه و تحلیل داده ها ما دریافتیم که سطح درامد و تعداد نمایندگیها باتقاضای بیمه عمر رابطه مستقیم دارند و نرخ بهره و بار تکفل با تقاضای بیمه عمر رابطه عکس دارند

Minimum Average Delay of Routing Trees

The general communication tree embedding problem is the problem of mapping a set of communicating terminals, represented by a graph G, into the set of vertices of some physical network represented by a tree T . In the case where the vertices of G are mapped into the leaves of the host tree T the underlying tree is called a routing tree and if the internal vertices of T are forced to have degree...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEICE Transactions on Information and Systems

سال: 2020

ISSN: 0916-8532,1745-1361

DOI: 10.1587/transinf.2019iik0001