Comparison of change order risk identification road construction projects
نویسندگان
چکیده
Almost all existing projects always have change orders, both government and private projects. During the implementation of a construction project, changes can occur either from contractor or owner. The object research regarding order risk identification was carried out in West Java Province provinces DKI Jakarta Banten. Collecting data on real road 2013-2018. Data analysis by looking at similarities differences between two identification. number for Banten Provinces 732 changes, while there were 322 changes. works that experienced 31 works, 21 province Java. Identification average changing jobs 45.75 work, 32.2 work. Comparison Jakarta's is 53% greater than Java's
منابع مشابه
Change Management in Construction Projects
Decisions are made everyday in construction processes based on incomplete information, assumptions and the personal experience of the construction professionals. Project changes and/or adjustments are inevitable as they are a fact-of-life at all stages of a project’s life cycle. Managing changes effectively is crucial to the success of a construction project. Change management in construction r...
متن کاملEquitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملRisk Management in Construction Projects
The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...
متن کاملConceptual Cost Estimate of Road Construction Projects in Saudi Arabia
This study aims at developing regression models to predict the total construction cost of a road project in the early phases. The models were developed based on 52 sets of data collected in Saudi Arabia. The projects were implemented during 2011. The procedure used resulted in the formulation of 5 regression models; 2 of them include bid quantities of the major construction activities as indepe...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: E3S web of conferences
سال: 2023
ISSN: ['2555-0403', '2267-1242']
DOI: https://doi.org/10.1051/e3sconf/202342901009