Complicated Time-Constrained Project Scheduling Problems in Water Conservancy Construction

نویسندگان

چکیده

Water conservancy project scheduling is an extension to the classic resource-constrained problem (RCPSP). It limited by special time constraints called “forbidden windows” during which certain activities cannot be executed. To address this issue, a specific RCPSP model proposed, and approach designated for it incorporates both priority rule-based heuristic algorithm obtain acceptable solution, hybrid genetic further improve quality of solution. In algorithm, we introduce new crossover operator forbidden window adopt double justification elitism strategies. Finally, conduct simulated experiments on library compare proposed with other priority-rule based heuristics, results demonstrate superiority our algorithm.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

Time-constrained project scheduling

We propose a new approach for scheduling with strict deadlines and apply this approach to the TimeConstrained Project Scheduling Problem (TCPSP). To be able to meet these deadlines, it is possible to work in overtime or hire additional capacity in regular time or overtime. For this problem, we develop a two stage heuristic. The key of the approach lies in the first stage in which we construct p...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

a multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

a multi-mode resource-constrained optimization of time-cost trade-off problems in project scheduling using a genetic algorithm

in this paper, we present a genetic algorithm (ga) for optimization of a multi-mode resource constrained time cost trade off (mrctct) problem. the proposed ga, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. beyond earlier studies on time-cost trade-off problem, in mrctct problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Processes

سال: 2023

ISSN: ['2227-9717']

DOI: https://doi.org/10.3390/pr11041110