Component redundancy allocation in optimal cost preventive maintenance scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Component redundancy allocation in optimal cost preventive maintenance scheduling

This work presents a methodology to assess maintenance teams in the determination of the degree of redundancy that an active component must have in order to minimize its system life-cycle cost and in the definition of the corresponding maintenance plan schedule. The minimal required data are three average costs and one reliability function. It is useful in a system’s design phase, since in this...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

long term cost effective preventive maintenance scheduling

preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. it consists of knowing which generating units should be shut down for regular safety inspection. in this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (cri) is pr...

متن کامل

Preventive maintenance scheduling of multi-component systems with interval costs

We introduce the preventive maintenance scheduling problem with interval costs (PMSPIC), which is to schedule preventive maintenance (PM) of the components of a system over a finite and discretized time horizon, given a common set-up cost and component costs dependent on the lengths of the maintenance intervals. We present a 0-1 integer linear programming (0-1 ILP) model for the PMSPIC; the mod...

متن کامل

Scheduling of Preventive Maintenance for Generating Unit Considering Cost

Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(ReliabilityCentered Maintenance) evaluation. So, Markov state model is utilized considering a stochastic state in RCM. In this paper, the Markov state model which ca...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operational Research Society

سال: 2015

ISSN: 0160-5682,1476-9360

DOI: 10.1057/jors.2014.56