Computer control and data‐acquisition system for the rf test facility

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Data Acquisition and Control System for Samsung Superconductor Test Facility

Samsung Superconductor Test Facility (SSTF), a superconductor and superconducting magnet test facility, has been constructed at Samsung Advanced Institute of Technology. The main purpose of SSTF is to manufacture and test superconducting magnets for the Korean Superconducting Tokamak Advanced Research tokamak. The data Acquisition and Control (DAC) system for SSTF is composed of UNIX workstatio...

متن کامل

Bnl Accelerator Test Facility Control System Upgrade

Brookhaven National Laboratory’s Accelerator Test Facility (ATF) has embarked on a complete upgrade of its decade old computer system. The planned improvements affect every major component: processors (Intel Pentium replaces VAXes), operating system (Linux/Real-Time Linux supplants OpenVMS), and data acquisition equipment (fast Ethernet equipment replaces CAMAC serial highway.) This paper summa...

متن کامل

Low-Level RF System Design for the Accelerator Test Facility (ATF) Damping Ring

The ATF damping ring [1] was built to demonstrate the production of low emittance, high current beams for future linear colliders. To attain high beam currents, multiple high current bunch trains are required. The low-level rf system should be designed to minimize both steady-state and transient beam loading effects in the accelerating cavities. In addition the design should be sufficiently fle...

متن کامل

Radiation Shielding for Superconducting RF Cavity Test Facility at A0

The results of Monte Carlo radiation shielding study performed with the MARS15 code for the vertical test facility at the A0 north cave enclosure at Fermilab are presented and discussed.

متن کامل

TESLA Test Facility Control System and its Current Status

The TESLA Test Facility (TTF) linear accelerator for electrons is under construction at DESY [1]. It is based on the use of accelerating modules consisting of eight nine-cell superconducting cavities. About one year this linac (more than 100 meters in length) operated with one cryomodule and produced 125 MeV electrons. This period was intensively used by the control system developers to test, c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Review of Scientific Instruments

سال: 1986

ISSN: 0034-6748,1089-7623

DOI: 10.1063/1.1138790