Constraints in models of production and cost via slack-based measures
نویسندگان
چکیده
منابع مشابه
The proposed cost and profit models in presence of flexible measures
In conventional DEA, measures are classified as either input or output. However, in some real cases there are variables whose status is not known as input or output before assessment. These variable are known as flexible measures. One of the most important economic dimensions for ensuring the success of a company is the efficiency with which it uses its resources. Therefore, centering on Asses...
متن کاملmolecular and physiological characterizations of floral scent production in rosa damascena mill.
گل محمدی (r. damascena mill.)مهمترین گونه ای است که در تولید گلاب، عطر و اسانس، در صنعت عطرسازی و دارویی کاربرد دارد. با وجود اهمیت عطر گل محمدی، پژوهش های مولکولی و بیوشیمیایی عطر گل این گونه هنوز در مراحل ابتدایی است. در این پژوهش، ویژگی های مولکولی و فیزیولوژیکی تولید عطر در گل محمدی در آزمایش های مختلف مورد بررسی قرار گرفتند. در آزمایش اول، پژوهشی به منظور بررسی تنوع شیمیایی اسانس میان 44 ت...
Congestion Status Identification Using Slack Based Models in Data Envelopment Analysis
Congestion is a wasteful stage of the production process where outputs are reduced due to excessive amount of inputs. There are several approaches in data envelopment analysis (DEA) literatures to treat congestion. The concept of strong and weak congestion first developed by Tone and Sahoo [Tone, K., Sahoo, B.K., 2004. Degree of scale economies and congestion: A unified DEA approach. European J...
متن کاملa corpus-based study of the frequency of personal pronouns in translated and comparable non-translated persian texts
چکیده ندارد.
15 صفحه اولConstrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Empirical Economics
سال: 2021
ISSN: 0377-7332,1435-8921
DOI: 10.1007/s00181-020-02013-z