Construction and Operation of No. 2 Continuous Caster at Chita Plant, Daido Steel Co., Ltd.

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Utilization of CON1D at ArcelorMittal Dofasco’s No. 2 Continuous Caster for Crater End Determination

Accurate determination of the position of final solidification point or crater end at ArcelorMittal Dofasco’s No. 2 Continuous Caster (CC) is essential for maximizing both casting speed and equipment utilization. The caster is equipped with one 900-mm long, straight, water-cooled copper mold, and produces 218-mm thick slabs with a maximum width of ~1,600 mm. The casting speed range at the caste...

متن کامل

Integration of Continuous Caster and Hot Strip Mill Planning for Steel Production 9/11/99 Integration of Continuous Caster and Hot Strip Mill Planning for Steel Production

In this paper we present a model and a solution approach for integration of steel continuous casters and hot strip mills to provide more responsive steel production at lower unit cost. We describe the production environment and survey existing methods for planning continuous casters and hot strip mills. Since these processes lie at the solid/liquid interface we use “virtual” slabs, correspondin...

متن کامل

Development of a Model for Transient Simulation and Control of a Continuous Steel Slab Caster

A two-dimensional heat transfer model for transient simulation and control of a continuous steel slab caster is described. Slab thermal and solidification conditions are computed by the model as a function of time-varying casting speed, secondary spray cooling water flow rates and temperature, slab thickness, steel chemistry, and pouring and ambient temperatures. A solidification model that inc...

متن کامل

Study of Transient Flow and Particle Transport in Continuous Steel Caster Molds: Part Ii. Particle Transport

Particle motion and capture in continuous steel casters were simulated using a Lagrangian trajectory-tracking approach, based on time-dependent flow fields obtained from large eddy simulations (Part I). A computation was first conducted on a water model of a full-scale standard slab caster, where measurements were available. It simulated the transport of 15,000 plastic particles, and their remo...

متن کامل

Study of Transient Flow and Particle Transport in Continuous Steel Caster Molds: Part I. Fluid Flow

Unsteady three-dimensional flow in the mold region of the liquid pool during continuous casting of steel slabs has been computed using realistic geometries starting from the submerged inlet nozzle. Three largeeddy simulations (LES) have been validated with measurements and used to compare results between full-pool and symmetric half-pool domains and between a full-scale water model and actual b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: DENKI-SEIKO[ELECTRIC FURNACE STEEL]

سال: 1993

ISSN: 1883-4558,0011-8389

DOI: 10.4262/denkiseiko.64.13