Construction Delays in Clients Opinion – Multivariate Statistical Analysis

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling of Banks ‌Bankruptcy in Iran (Multivariate Statistical Analysis)

In this paper we construct a modeling for detection of banks which are experiencing serious problems. Sample and variable set of the study contains 30 banks of Iran during 2006-2014 and their financial ratios. Well known multivariate statistical technique (principal component analysis) was used to explore the basic financial characteristics of the banks, and discriminant Logit and Probit models ...

متن کامل

Multivariate Statistical Analysis

Classical multivariate statistical methods concern models, distributions and inference based on the Gaussian distribution. These are the topics in the first textbook for mathematical statisticians by T.W. Anderson that was published in 1958 and that appeared as a slightly expanded 3rd edition in 2003. Matrix theory and notation is used there extensively to efficiently derive properties of the m...

متن کامل

Introduction to Multivariate Statistical Analysis in Chemometrics

Why to read "yet another book" on statistical methods? This is a question that may arise among chemometricians, chemists, students or anyone using chemometric methods in their research or everyday routine work. However, this book is a very good contribution to a better understanding of statistics because it really captures the point of potential misunderstanding between chemists and mathematici...

متن کامل

Evaluation of water quality using heavy metal index and multivariate statistical analysis in Lorestan province,Iran

In the present study, the water quality of Silakhor River, located in Rahim Abad hydrometric station, was analyzed based on Boron, Iron, Nickel, Fluorine, Manganese, Chromium, Cadmium, Aluminum, Copper, Zinc and Lead pollution. The samples were collected from Silakhor River in Rahim Abad hydrometric station during a one-year period, from December 2012 to November 2013. In addition, metal index ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Engineering

سال: 2015

ISSN: 1877-7058

DOI: 10.1016/j.proeng.2015.10.075