Construction Engineering of the World's Largest Pneumatic Caisson

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

Resistance Analysis of Open Caisson Towing on Water in the Construction of the Large Scale Bridge

In order to solve the towing problem on water of the open caisson in the construction of the large scale bridge efficiently, combining with the towing operation project, the dragged open caisson and environmental data, etc. we design and produce the open caisson physical model and configure the test environment, use the force cell to collect real-time experimental data, analyze and demonstrate ...

متن کامل

Development of myopia as a hazard for workers in pneumatic caissons.

BACKGROUND/AIM Pneumatic caisson engineering has been developed for large civil engineering constructions. Because of complaints of blurred vision by personnel working in pneumatic caissons, the development of myopia was suspected. The aim of this study was to determine the cause of the blurred vision and the mechanism underlying the changes. METHODS 12 caisson workers underwent a complete op...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Concrete Journal

سال: 2012

ISSN: 0387-1061,2186-2753

DOI: 10.3151/coj.50.919