CONSTRUCTION OF NEW MULTI-FUNCTION TYPE ARTIFICIAL BOUNDARY PILLAR FOR TRANSITION FROM OPEN PIT TO UNDERGROUND MINING

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

Optimizing the open pit-to-underground mining transition

A large number of metal deposits are initially extracted via surface methods, but then transition underground without necessarily ceasing to operate above ground. Currently, most mine operators schedule the open pit and underground operations independently and then merge the two, creating a myopic solution. We present a methodology to maximize the NPV for an entire metal deposit by determining ...

متن کامل

Physical Model Test and Numerical Simulation Study of Deformation Mechanism of Wall Rock on Open Pit to Underground Mining (RESEARCH NOTE)

This paper is based on the open pit to underground mining practice of Daye Iron Mine. The influence mechanism between high-steep slope and non-pillar sublevel caving method is studied by using physical model test. Firstly, engineering geological properties of the choosing typical research section is analysed and generalized. Secondly, the system of open pit to underground mining is developing a...

متن کامل

Scheduling Tools for Open-Pit Mining Operations

In open-pit mining operations, there are several levels of planning, each of which passes down restrictions to the level below. Each planning task is to determine the order in which material should be mined and how it should be processed, such that blending and utilisation targets are met. The mining operations are subject to various constraints on equipment use, maintenance and other resources...

متن کامل

a new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot

abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Stavební obzor - Civil Engineering Journal

سال: 2019

ISSN: 1805-2576

DOI: 10.14311/cej.2019.01.0008