Construction Project Evaluation Using CPM-Crashing, CPM-PERT and CCPM for Minimize Project Delays

نویسندگان

چکیده

Abstract This research conducted in one construction company Indonesia, the was facing several problems, many projects that already ended have delays. Overdue payment of can reach Rp 252.544.148.-. For calculating late save researcher using Critical Path Method (CPM)-Crashing. CPM-Crashing method accelerate project duration by increase resource budget, so doesn’t need to pay overdue payment. The result is Rp. 227.584.147.-late To anticipate delay proper planning required. One scheduling. Great loss because amount, must evaluate their schedule. Researcher CPM-Project Evaluation Review Technic (PERT) and Chain Project Management (CCPM) both methods give new CPM-PERT probability finish CCPM this not very low only 55% on time, try

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Collaborative Project Management (CPM)

Zulieferer übernehmen inzwischen immer umfangreichere Aufgaben in der Entwicklung und Produktion, was zu neuen Herausforderungen im Projektmanagement führt. Nach VDA (2003) sind deshalb neue Formen der Zusammenarbeit zwischen Projektpartnern notwendig. Aus diesem Grund initiierten BMW und Daimler gemeinsam mit großen Zulieferern wie ZF Friedrichshafen, Karmann und Keiper beim ProSTEP iViP Verei...

متن کامل

Project Description CPM: Cyber-Physical Data Mining for Predictive Maintenance

The world around us is in a constant flux with “things” changing dynamically. Houses are airconditioned, power is generated, distributed and consumed, cars drive on roads and highways, plants manufacture materials and objects, commercial transactions are made and recorded in information systems. Airplanes fly, continuously changing location and velocity while their controllers deal with various...

متن کامل

A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by P...

متن کامل

Pert 21

More than half a century after the debut of CPM and PERT, we still lack a project scheduling system with calibrated and validated distributions and without requiring complex user input. Modern decision support systems (DSS) for project management are more sophisticated and comprehensive than PERT/CPM. Nonetheless, in terms of stochastic analysis, they show insufficient progress. PERT 21 offers ...

متن کامل

Evaluation of Project Critical Success Factors for Key Construction Players and Objectives

Critical Success Factors (CSFs) are used to support and evaluate the success of a strategic and tactical approach in project implementation in order to increase the probability of success. This system is used by executors in project delivery to achieve improved performance capabilities with limited resources. The present paper aims to identify the impact of CSFs amongst the main elements involv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of physics

سال: 2021

ISSN: ['0022-3700', '1747-3721', '0368-3508', '1747-3713']

DOI: https://doi.org/10.1088/1742-6596/1933/1/012096