Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM)

نویسندگان

چکیده

On account of ever increasing complexities and uncertainties, construction project management has become more challenging day by day. As a result, continuous monitoring emerges as prime concern for the planned activities to be completed on schedule within budget. Limitations in traditional time cost practices result overrun which seriously hinder successful completion project. The impact at various stages is critical factor project's management. Most projects Bangladesh have with extra leads demand additional because poor controlling system. In these consequences, widely recognized emerging technique, Earned Value Management (EVM) can introduced conduct progress, performance forecasting. EVM measures actual work any respect original integrating scope, order predict timeline. this study, three-storied residential building Khulna, was considered perform earned value tracking whether either delay or not along over budget under particular operations up first six months were assessed using an based work-breakdown structure (WBS), real costs compared projected program. progress constructed considering also evaluated through analyzing indexes Microsoft Project Professional 2019 software. Construction respecting variance (CV), (SV), index (CPI) (SPI). CV CPI are evidently less than 0 1, respectively, indicating thatthe verge overrun; other hand, SV SPI both that running behind after months. if pursued its current pace, it will finished above It undoubtedly assist rescheduling bring back harmony.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Cost Monitoring of Construction Projects Through Earned Value Analysis

In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

Practical Experiences of Cost/Schedule Measure Through Earned Value Management and Statistical Process Control

Cost and schedule measures are the most important support activities for the success of a project; it provides the basis for process improvement and project management. This paper reports practical experiences on using EVM (Earned Value Management) and SPC(Statistical Process Control) in cost/ schedule measure. The analysis of experience data indicates the distributions of CPI(Cost Performance ...

متن کامل

Using Earned Value Management (EVM) in Spiral Development

Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and " No Warranty " statements are included with all reproductions and derivative works. External use. Requests for permission ...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Technology Management and Business

سال: 2021

ISSN: ['2289-7224', '2600-7967']

DOI: https://doi.org/10.30880/jtmb.2021.08.01.001