Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project
نویسندگان
چکیده
منابع مشابه
International Project Risk Management for Nuclear Power Plant (NPP) Construction: Featuring Comparative Analysis with Fossil and Gas Power Plants
The concern of risk management has continuously increased in international construction projects. International projects have a high level of risk and complexity, which results in greater possibilities of cost overruns and schedule conflicts when compared with local projects. Therefore, the goal of risk management is to improve project performance by systematically identifying and assessing pro...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملAn integrated fuzzy AHP-ELECTRE methodology for environmental impact assessment
Environmental impact assessment (EIA) is the assessment of the possible impact that a proposed plan or project may have on the environment, together consisting of the natural, social and economic aspects. The aim of this paper is to propose an environmental impact assessment methodology based on an integrated fuzzy AHP–ELECTRE approach in the context of urban industrial planning. In the propose...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملenvironmental risk assessment of gas pipelines by using of ahp combined method
nowadays environmental risk assessment is under consideration alike a useful tool in studies for environmental risk management of projects with high level of potential of destruction and hazards. projects of gas transportation pipelines, unlike technical and economical justification in the field of energy supplying for societies, by having danger on environment, need to the continuous studies o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Engineering and Technology
سال: 2015
ISSN: 1738-5733
DOI: 10.1016/j.net.2014.12.019