Construction schedule planning for railway station facilities

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Locating mobile facilities in railway construction management ¬リニ

The location problem with mobile facilities is motivated by a real-life railway construction project. In railway construction, (im)mobile concrete batching facilities are located to build viaducts and tunnels on a line over a planning horizon. The problem is to determine the number and types of facilities to be located, to schedule the movement of mobile facilities, and to make concrete product...

متن کامل

Train schedule coordination at interchange station in an open railway market through agent negotiation

In open railway markets, coordinating train schedules at an interchange station requires negotiation between two independent train operating companies to resolve their operational conflicts. This paper models the stakeholders as software agents and proposes an agent negotiation model to study their interaction. Three negotiation strategies have been devised to represent the possible objectives ...

متن کامل

Construction of Optimal Databases for Railway-station Restoration Knowledge Management Systems

This paper presents database structures with fast access time and easy extensibility for railway-station data storage. These structures will help to build optimal strategies for reconstruction plans and provide data for design software, such as the world famous ARCHICAD, which is straightforward in using in designing architectural restoration, based on pre-existent architectural plans. The impl...

متن کامل

Highway Interchanges: Construction Schedule and Traffic Planning Visualization

Highway Interchange projects present particularly complex and changing geometric configurations. Such configurations are hard to visualize and understand, and associated management, construction decisions, and traffic control strategies are difficult to optimize and communicate. This paper presents a computerbased system, which utilizes 3D and 4D CAD technology in order to: facilitate the commu...

متن کامل

Railway station route searching based on ACA

In the railway station signal system, the route searching algorithm is an important software module to realize the function safety of this system. In the paper, the ant colony algorithm is applied to the railway station route searching. Take the specific station route-the Wangzhai Station route for example to search the shortest route. The ideas of the Wangzhai Station route searching are put f...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2021

ISSN: 1757-8981,1757-899X

DOI: 10.1088/1757-899x/1151/1/012012