Construction waste generation due to the design phase

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Construction Waste Generation in the Iranian Building Industry

Building industry as one of the greatest industries in Iran comprises a significant share of waste generation in the country. Since a large quantity of the generated construction waste is buried due to the lack of a recycling protocol, it leads to an undesired waste of resources and causes severe environmental issues. This paper provides a study on the problem of material loss/construction wast...

متن کامل

Factors affecting the rural domestic waste generation

The current study was carried out to evaluate the quantity and quality of rural domestic waste generation and to identify the factors affecting it in rural areas of Khodabandeh county in Zanjan Province, Iran. Waste samplings consisted of 318 rural households in 11 villages. In order to evaluate the quality and quantity of the rural domestic waste, waste production was classified into 12 groups...

متن کامل

Contruction waste generation across construction project life-cycle

The construction and demolition waste (CDW), which is produced by the construction process, presents 33% of the total waste stream in European Union in year 2010 (Eurostat 2010). A construction and demolition waste is generated during whole life cycle of construction design phase, realization phase, occupation phase and demolition phase. On the other hand, the sustainable design of construction...

متن کامل

Architects' perspectives on construction waste reduction by design.

The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made ...

متن کامل

TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Gerontechnology

سال: 2012

ISSN: 1569-111X,1569-1101

DOI: 10.4017/gt.2012.11.02.173.00