Coordinated Logistics: Joint Replenishment with Capacitated Transportation for a Supply Chain
نویسندگان
چکیده
منابع مشابه
A hybrid GA-TLBO algorithm for optimizing a capacitated three-stage supply chain network
A teaching-learning-based optimization (TLBO) algorithm is a new population-based algorithm applied in some applications in the literature successfully. Moreover, a genetic algorithm (GA) is a popular tool employed widely in many disciplines of engineering. In this paper, a hybrid GA-TLBO algorithm is proposed for the capacitated three-stage supply chain network design (SCND) problem. The SCND ...
متن کاملA Capacitated Multi - Echelon Joint Location - Inventory Model for Supply Chain Management
In this paper we impose a capacity restriction on a multi-echelon joint location-inventory model. The setting is that of a single product manufacturer distributing its product to a number of warehouses, each of which is assigned to a number of retailers. There is no lateral supply between warehouses and they do not share retailers. The model simultaneously makes decisions on location and invent...
متن کاملA Replenishment Framework for the Supply Chain Operations Reference Model
Combining with the collaborations between business customers and suppliers, traditional purchasing and logistics functions have evolved into a broader concept of materials and distribution management, namely, supply chain management (SCM) (Tan, 2001). This chapter reviews the literature of SCM from several paths that can be the basis of a proposed framework for SCM within academic and manageria...
متن کاملDiverse replenishment frequency model for TOC supply chain replenishment systems with capacity constraints
When the theory of constraints (TOC) supply chain replenishment system (TOC-SCRS) is deployed in a plant or a central warehouse, replenishment frequency (RF) becomes one of the important decision parameters and depends on the sales or replenishment quantity (RQ) in the plant. The higher RF is preferred by TOC for the low inventory and the fast response to different market requirements. However,...
متن کاملA Capacitated Production Planning Problem for Closed-Loop Supply Chain
This paper addresses a dynamic Capacitated Production Planning (CPP) problem in steel enterprise employing a closed-loop supply chain strategy, in which a remanufacturing process is adopted. We develop a model in which all demands are met by production or remanufacturing without backlogs, under the context that both the production and remanufacturing setup cost functions are arbitrary and time-...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Production and Operations Management
سال: 2013
ISSN: 1059-1478
DOI: 10.1111/poms.12041