Correction to: Yard block assignment, internal truck operations, and berth allocation in container terminals: introducing carbon-footprint minimisation objectives

نویسندگان

چکیده

Due to a technical error the header of equation 1 has been broken in PDF version this article. It should read.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals

We focus on the integrated seaside operations in container terminals, namely the integration of berth allocation, quay crane assignment and quay crane scheduling problems. We first develope a mixed-integer linear programming formulation. Then, we propose an efficient cutting plane algorithm based on a decomposition scheme. Our approach deals with berthing positions of the vessels and their assi...

متن کامل

Optimal berth allocation and time-invariant quay crane assignment in container terminals

Due to the dramatic increase in the world’s container traffic, the efficient management of operations in seaport container terminals has become a crucial issue. In this work, we focus on the integrated planning of the following problems faced at container terminals: berth allocation, quay crane assignment (number), and quay crane assignment (specific). First, we formulate a new binary integer l...

متن کامل

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

In this work, we focus on the integrated planning of the following problems faced within the context of seaside operations at container terminals: berth allocation, quay crane assignment, and quay crane scheduling. First, we formulate a new binary integer linear program for the integrated solution of the berth allocation and quay crane assignment problems called BACAP. Then we extend it by inco...

متن کامل

Scheduling vessels and container-yard operations with conflicting objectives

__________________________________________________________ We consider the problem of coordinating the operations of two supply chain partners: a foreign shipping company and a domestic port. The two partners have conflicting business objectives, and the issue is to determine the optimal cycle time, by which the shipping company removes the empty containers from the domestic port, so that the j...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Maritime economics and logistics

سال: 2021

ISSN: ['1479-294X', '1479-2931']

DOI: https://doi.org/10.1057/s41278-021-00191-w