Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
نویسندگان
چکیده
منابع مشابه
ec adoption and critical success factors of ec in smes in iran
تجارت الکترونیکی شیوه اجرای مسئولیتها، تقابل با مشتریان و امور معمول عملیاتی در شرکتها را تغییر داده است. تجارت الکترونیکی در عمل تنها خرید و فروش کالاها را از طریق ابزار الکترونیک نمی باشد، بلکه تمام فعالیتهای لازم جهت انجام فرایند فروش را نیز در بر میگیرد. در اواخر دهه 1990 بسیاری از شرکتها فعالیتهای خود را به منظور دستیابی به مشتریان جدید و یا ارائه فرصتهای جدید به مشتریان موجود گسترش دادند...
Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
متن کاملproficiency level and factors fostering reticence in efl learners
according to cheng (1999), in recent esl/efl literature, asian (especially east asian) learners of english as a foreign/second language have been arguably reported as reticent and passive learners. the most common allegations are that these students are reluctant to participate in classroom discourse; they are unwilling to give responses; they do not ask questions; and they are passive and over...
15 صفحه اولdevelopment and implementation of an optimized control strategy for induction machine in an electric vehicle
in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...
15 صفحه اولInvestigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects
Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Construction Management and Economics
سال: 2010
ISSN: 0144-6193,1466-433X
DOI: 10.1080/01446191003674519