Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects
نویسندگان
چکیده
منابع مشابه
Study on Construction Cost of Construction Projects
China is a country which has the largest investment amount in engineering construction in the world and which has the most construction projects. It is a significant subject for the extensive engineering managers to have effective engineering cost management in construction project management and to reasonably determine and control construction cost on the condition of ensuring construction qua...
متن کاملMulti-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...
متن کاملCost Performance Estimation in Construction Projects Using Fuzzy Time Series
In this paper, the authors develop a model to estimate future performance of construction projects. For the purpose of estimation, fuzzy times series models are used as an effective approach in estimation process. Furthermore, linguistic terms are applied to interpret the fuzzy-based results. The proposed model can assists project managers to develop their knowledge concerning the future aspect...
متن کاملApplication of Evidence Theory to Construction Projects
Crucial decisions are necessary throughout the life-cycle of large-scale construction projects. Such decisions are critical in that they have a direct impact upon the outcomes and success of a given project. To improve the decision process, an evidential reasoning framework based on the Dezert-Smarandache theory of plausible and paradoxical reasoning, where heterogeneous evidence sources are fu...
متن کاملModeling construction time in Spanish building projects
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia Engineering
سال: 2016
ISSN: 1877-7058
DOI: 10.1016/j.proeng.2016.04.152