Cost Overruns in Engineering Procurement Construction (EPC) Fabrication Oil and Gas Megaprojects in Malaysia: The Importance of Resource Allocation (5M)

نویسندگان

چکیده

Every project involved in oil and gas fabrication erected onshore usually experiences cost overruns if lack of monitoring. This overrun is closely related to the use machines, manpower, methods, money, materials (5M) order a where all these resources require good financial cycle. However, often occur due improper management planned resource allocation from 5M. Therefore, this study was aimed examine importance on control specifically projects as preliminary study. Semi-structured interviews were conducted with ten (10) qualified specialists Engineering Procurement Construction (EPC) Oil Gas industry. Among that contribute controlled are spending within budget, meeting value, optimizing usage materials, sufficiently manage machinery manpower match goals. The networks ATLAS-ti, it discovered money had greater impact allocated resources, issue budget or does not meet requirements major led overruns.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the analysis of the role of the speech acts theory in translating and dubbing hollywood films

از محوری ترین اثراتی که یک فیلم سینمایی ایجاد می کند دیالوگ هایی است که هنرپیش گان فیلم میگویند. به زعم یک فیلم ساز, یک شیوه متأثر نمودن مخاطب از اثر منظوره نیروی گفتارهای گوینده, مثل نیروی عاطفی, ترس آور, غم انگیز, هیجان انگیز و غیره, است. این مطالعه به بررسی این مسأله مبادرت کرده است که آیا نیروی فراگفتاری هنرپیش گان به مثابه ی اعمال گفتاری در پنج فیلم هالیوودی در نسخه های دوبله شده باز تولید...

15 صفحه اول

Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...

متن کامل

the stady and analysis of rice agroclimatology in lenjan

the west of esfahan province, iran, is one of the most important agricultural areas throughout the country due to the climate variability and life-giving water of zayanderood river. rice is one of the major and economic crops in this area. the most important climatic elements in agricultural activities which should be considered include temperature, relative humidity, precipitation and wind. so...

15 صفحه اول

the translators agency and ideological manipulation in translation: the case of political texts in translation classes in iran

در این تحقیق به نقش واسطه ای مترجم در ایجاد تغییرات ایدئولوژیک در ترجمه متون سیاسی پرداخته شده است. بدین منظور محقق متنی سیاسی در خصوص ادعاهای آمریکا در مورد برنامه هسته ای ایران را انتخاب کرد. این متن از سایت spacewar.com انتخاب شد که دارای ایدئولوژی مغرضانه در مورد برنامه هسته ای ایران است. سپس یک گروه 30 نفره از دانشجویان کارشناسی ارشدرشته مترجمی زبان انگلیسی دانشگاه شیخ بهایی انتخاب شدند. ا...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International journal of academic research in business & social sciences

سال: 2022

ISSN: ['2308-3816', '2222-6990']

DOI: https://doi.org/10.6007/ijarbss/v12-i9/14752