Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects
نویسندگان
چکیده
منابع مشابه
CBR-based cost prediction model-II of the design phase for multi-family housing projects
Predicting adequate construction cost is an important factor in effective investment because owners must set the most appropriate budget for their projects. Unlike the existing cost prediction models, the variables that have an interrelation with construction cost were selected as attributes using correlation analysis based on 786 cases. In selecting the attribute weight, the cost prediction mo...
متن کاملAre Public Housing Projects Good for Kids?
One goal of federal housing policy is to improve the prospects of children in poor families. This paper examines the effect of public housing participation on housing quality and educational attainment. Using the SIPP, we show that living in projects is associated with more negative outcomes for children, although this appears to be due to unobserved heterogeneity. We control for the endogeneit...
متن کاملTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملA Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects
Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...
متن کاملA Multi-Objective Programming Model for Disaster Preparedness Planning
Nowadays, the necessity of accurate quantitative decision support methods is becoming a critical subject for managers as rivalry between organizations caused a more fragile economic environment and brand reputation is becoming more important. Furthermore, dealing with incidents after they happened is not accepted by customers anymore. Managers require powerful decision making tools to support t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Korean Journal of Construction Engineering and Management
سال: 2012
ISSN: 2005-6095
DOI: 10.6106/kjcem.2012.13.2.091