Credibility based chance constrained programming for project scheduling with fuzzy activity durations
نویسندگان
چکیده
منابع مشابه
A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملSOME PROPERTIES FOR FUZZY CHANCE CONSTRAINED PROGRAMMING
Convexity theory and duality theory are important issues in math- ematical programming. Within the framework of credibility theory, this paper rst introduces the concept of convex fuzzy variables and some basic criteria. Furthermore, a convexity theorem for fuzzy chance constrained programming is proved by adding some convexity conditions on the objective and constraint functions. Finally,...
متن کاملA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملsome properties for fuzzy chance constrained programming
convexity theory and duality theory are important issues in math- ematical programming. within the framework of credibility theory, this paper rst introduces the concept of convex fuzzy variables and some basic criteria. furthermore, a convexity theorem for fuzzy chance constrained programming is proved by adding some convexity conditions on the objective and constraint functions. finally,...
متن کاملUncertain Chance-constrained Programming Model for Project Scheduling Problem
Project scheduling problem is to determine the schedule of allocating the loans to a project in order to balance the total cost and the completion time of the project under some constraints. This paper considers project scheduling problem in an uncertain environment, of which the duration time of each activity is an uncertain variable. Then uncertain chance-constrained programming model is cons...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: An International Journal of Optimization and Control: Theories & Applications (IJOCTA)
سال: 2019
ISSN: 2146-5703,2146-0957
DOI: 10.11121/ijocta.01.2019.00631