Critical Chain Design Structure Matrix Method for Construction Project Scheduling under Rework Scenarios
نویسندگان
چکیده
منابع مشابه
an inventory–scheduling model for supply chain of construction project
one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...
متن کاملThe Impact of Design Rework on Construction Project Performance
Rework in construction development projects can significantly degrade project cost and schedule performance. In a typical construction development project which involves design and construction, rework in the construction phase could increase construction cost by 10%-15% of the contract price (Burati. 1992, Josephson & Hammerlund 1999, Love & Li 2000). The proportion of money and time spent on ...
متن کاملA Genetic Algorithm for The Critical Chain Project Scheduling Problem
Abstract This work aims to study a project scheduling method based Critical Chain Method (CCM), which is a burgeoning project scheduling technology based on the Theory of Constraints (TOC). We formulate the model of the critical chain project scheduling problem, in which a simplified scheme of critical chain project scheduling is used to generate the critical chain project plan. And then, a gen...
متن کاملCritical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing
In this paper, we introduce a method for buffer sizing in Critical Chain project scheduling. Proposed approach considers lognormal distribution for modeling activities’ execution time. The inherent uncertainty of activities considered as a main factor to size the buffer in proposed method. For comparing with traditional methods we used problems presented in literature. The results depict that p...
متن کاملnew method to determine buffer size for high risk project environment in critical chain method
in this research, a method for determining feeding buffer sizes in critical chain project scheduling is introduced. the method integrates project characteristics into the formulation as well as environment project risk. resource tightness, environment risk and network morphology incorporate into the formulation. the method is tested and compared to three commonly suggested methods in the litera...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2019
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2019/1595628