Critical Chain Project Scheduling: Do Not Oversimplify

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Genetic Algorithm for The Critical Chain Project Scheduling Problem

Abstract This work aims to study a project scheduling method based Critical Chain Method (CCM), which is a burgeoning project scheduling technology based on the Theory of Constraints (TOC). We formulate the model of the critical chain project scheduling problem, in which a simplified scheme of critical chain project scheduling is used to generate the critical chain project plan. And then, a gen...

متن کامل

Critical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing

In this paper, we introduce a method for buffer sizing in Critical Chain project scheduling. Proposed approach considers lognormal distribution for modeling activities’ execution time. The inherent uncertainty of activities considered as a main factor to size the buffer in proposed method. For comparing with traditional methods we used problems presented in literature. The results depict that p...

متن کامل

an inventory–scheduling model for supply chain of construction project

one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...

متن کامل

Project scheduling in supply chain environment

In this paper, we study scheduling of several projects in supply chain environment; activities of these projects are performed by some contractor companies. We present a new practical model for solving project scheduling problem in supply chain environment. A genetic algorithm and a simulated annealing algorithm are proposed for solving our model. The elements of genetic algorithm such as gener...

متن کامل

Critical Chain Project Management Theory and Practice

It is now over 10 years since the first publication on Critical Chain Project Management (CCPM) (Goldratt, 1997). Since then, software and implementation practice have developed rapidly. The logic and assumptions underpinning this new knowledge has recently been published (Goldratt, 2007) in the form of a strategy and tactics (S&T) tree. It is, therefore, timely to review the CCPM claims from b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Project Management Journal

سال: 2002

ISSN: 8756-9728,1938-9507

DOI: 10.1177/875697280203300406