Critical path-driven property and performance transitions in heterogeneous microstructures

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test

the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...

15 صفحه اول

The Effect of Property Rights on Entrepreneurship:Evidence from Some Factor-driven, Efficiency-driven, and Innovation-driven Countries

Entrepreneurship is influenced by many factors and environments such as institutions. Institutions have an important role to play in the individual's tendency toward necessity and opportunity entrepreneurship. The purpose of this paper was to examine the impact of institutional quality (property rights) on opportunity and necessity entrepreneurship. The results, based on unbalanced panel data f...

متن کامل

ec adoption and critical success factors of ec in smes in iran

تجارت الکترونیکی شیوه اجرای مسئولیتها، تقابل با مشتریان و امور معمول عملیاتی در شرکتها را تغییر داده است. تجارت الکترونیکی در عمل تنها خرید و فروش کالاها را از طریق ابزار الکترونیک نمی باشد، بلکه تمام فعالیتهای لازم جهت انجام فرایند فروش را نیز در بر میگیرد. در اواخر دهه 1990 بسیاری از شرکتها فعالیتهای خود را به منظور دستیابی به مشتریان جدید و یا ارائه فرصتهای جدید به مشتریان موجود گسترش دادند...

Performance-driven technology mapping for heterogeneous FPGAs

In order to maximize performance and device utilization, the recent generation of field programmable gate arrays (FPGAs) take advantage of speed and density benefits resulting from heterogeneous FPGAs, which can be classified into heterogeneous FPGAs without bounded resources or heterogeneous FPGAs with bounded resources. In this paper, we study the technology mapping problem for heterogeneous ...

متن کامل

Parallel performance evaluation through critical path analysis

In this paper we discuss the concept of space-time diagrams as a representation of the execution of an application, and then give a method, based on critical path analysis, for calculating nontrivial upper bounds on the potential parallelism, known as the average parallelism, a complement to the speedup and efficiency.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Materials Science

سال: 2017

ISSN: 0022-2461,1573-4803

DOI: 10.1007/s10853-017-0791-5