Critical Path Method dan Algoritma Genetika untuk Optimasi Durasi dan Biaya Pembangunan

نویسندگان

چکیده

A large project requires proper scheduling to obtain the duration of development and costs incurred more optimally. Optimization is submitting efficient solution by using various alternatives that can be reviewed in terms cost time. problems solved operating research. Selected Critical Path Method Genetic Algorithm as a compelling method for planning an methods rolling schedules because this considers assumption time, then implementation done without thinking about resources also determine when activity starts end project. While provide quick results forming schedule. Based on study obtained has managed get optimization value minimizing CPM (Critical Method) 199 days from total time construction health center Biau 210 working days. due genetic algorithms amounted Rp. 231,515,082 initial Rp.382,784,000.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Watermarking pada Video: Robustness, Impercetibility dan Pendekatan untuk Domain Terkompresi

ABSTRAK Meningkatnya penggunaan dokumen digital khususnya multimedia (citra, audio, video) dan kemudahan transmisi data melalui Internet meningkatkan kebutuhan terhadap keamanan data terhadap pelanggaran hak cipta. Watermarking merupakan pendekatan yang telah banyak digunakan dan merupakan bagian dari Digital Right Management (DRM) yang dibuat untuk memenuhi kebutuhan tersebut. Khusus untuk vid...

متن کامل

Desain dan Implementasi Face Recognition dan Live Streaming pada Sistem Digital Assistant untuk Staf Medik Fungsional menggunakan Google Glass

Abstrak— Dalam era globalisasi saat ini, rumah sakit dituntut untuk meningkatkan kinerja dan daya saing sebagai badan usaha dengan tidak mengurangi misi sosial yang dibawanya. Hal ini berarti bahwa rumah sakit harus menerapkan kebijakankebijakan strategis agar mampu secara cepat dan tepat dalam pengambilan keputusan sehingga dapat menjadi organisasi yang responsif, inovatif, efektif, dan efisie...

متن کامل

Yang Dan

Yang Dan Howard Hughes Medical Institute and the University of California, Berkeley Yang Dan is a Paul Licht Distinguished Professor in Biology and an Investigator of the Howard Hughes Medical Institute at the University of California, Berkeley. She grew up in Beijing and studied physics as an undergraduate student at Peking University. She conducted her PhD research in the lab of Mu-ming Poo a...

متن کامل

Order Dan

Proof. There are three cases: (1) A and B are in the same column. Then, since in each column we picked the shortest student, A is shorter than B. (2) A and B are in the same row. Then, since in each row we picked the tallest student, B is taller than A. (3) A and B are neither in the same row, nor in the same column. Let C be a student who is in the same row as A and in the same column as B. Th...

متن کامل

Dan Sperber

An objection to the memetic approach to culture Memetics is one possible evolutionary approach to the study of culture. Boyd and Richerson's models (1985, Boyd this volume), or my epidemiology of representations (1985, 1996), are among other possible evolutionary approaches inspired in various ways by Darwin. The memetic approach is based on the claim that culture is made of memes. If one takes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Euler: Jurnal Ilmiah Matematika, Sains dan Teknologi

سال: 2022

ISSN: ['2776-3706', '2087-9393']

DOI: https://doi.org/10.34312/euler.v10i2.14488