Critical Path Reduction of Distributed Arithmetic Based FIR Filter

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization of Distributed Arithmetic Based Fir Filter

Abstract:The VLSI design industry has grown rapidly during the last few decades. The complexity of the applications increases day by day due to which the area utilization increases. The tradeoff between area and speed is an important factor. The main focus of continued research has been to increase the operating speed by keeping the area and memory utilization of the design as low as possible. ...

متن کامل

Low Power Distributed Arithmetic Based Fir Filter

Datapath architectures are the critical components in computational intense applications and their architectural changes leads to changes in VLSI design constraints like area, performance and power. And in this modern automated world, the power constraint has been the major requirement; hence an effort has been applied regarding the necessary. This brief implements the Low power Finite Impulse ...

متن کامل

Implementation of High Speed Pipelined Distributed Arithmetic Based FIR Filter

In the explosive growth of wireless and networking applications, Digital Signal Processing (DSP) operations are extensively used for characterizing and controlling the discrete input signals. For those DSP operations, Finite Impulse Response (FIR) filter is used to filter the unwanted/noise/distorted signals from the discrete input signals. In this study, design of Pipelined Distributed Arithme...

متن کامل

Distributed Arithmetic Unit Design for Fir Filter

In this paper different distributed Arithmetic (DA) architectures are proposed for Finite Impulse Response (FIR) filter. FIR filter is the main part of the Digital Signal Processing. In Digital Signal Processing we can use Multiply Accumulator Circuit (MAC) and DA for filter design.MAC consumes more power and area because of multiplier and adder circuit. The design distributed arithmetic is run...

متن کامل

Low Power Adaptive FIR Filter Based on Distributed Arithmetic

This paper aims at implementation of a low power adaptive FIR filter based on distributed arithmetic (DA) with low power, high throughput, and low area. Least Mean Square (LMS) Algorithm is used to update the weight and decrease the mean square error between the current filter output and the desired response. The pipelined Distributed Arithmetic table reduces switching activity and hence it red...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Advanced Computer Science and Applications

سال: 2016

ISSN: 2156-5570,2158-107X

DOI: 10.14569/ijacsa.2016.070311