Critical Pathway Development: An Integrative Literature Review

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Critical pathway development: an integrative literature review.

OBJECTIVE The purpose of this integrative literature review was to summarize and analyze the methods used to develop critical pathways. METHOD Relevant articles published in occupational therapy, physical therapy, nursing, and medical journals between 1992 and 1997 were reviewed to extract various methods and the steps or criteria used for each method. RESULTS Nine approaches to critical pa...

متن کامل

Immediate transfusion incidents: an integrative literature review

This integrative literature review had the objective of analyzing research on the occurrence of immediate transfusion incidents and implemented hemovigilance actions. Data were obtained through database searches of LILACS, MEDLINE and PubMed, for the period of 1980 to 2009, in the Portuguese, English and Spanish languages. We identified 1382 articles, of which 29 met the established inclusion c...

متن کامل

Conceptualization of comorbid anxiety in autism spectrum disorder: An integrative literature review

Introduction: Anxiety is highly comorbid in children and adolescents with autism spectrum disorder (ASD), contributing to considerable impairments. In this account, the aim of study was to explore the explanations of anxiety in children and adolescents with ASD in relevant literature. Materials and Methods: This study is an integrative literature review and 3 electronic databases- Scopus, Scien...

متن کامل

Diagnosing dying: an integrative literature review

BACKGROUND To ensure patients and families receive appropriate end-of-life care pathways and guidelines aim to inform clinical decision making. Ensuring appropriate outcomes through the use of these decision aids is dependent on timely use. Diagnosing dying is a complex clinical decision, and most of the available practice checklists relate to cancer. There is a need to review evidence to estab...

متن کامل

Executive Coaching: An Integrative Literature Review

Executive coaching literature was investigated to uncover common themes within definitions, models and approaches, and effectiveness. An integrative literature review of 533 publications found relationship, goals, performance, and learning to be keywords used most often in defining executive coaching. The most prominent approaches included cognitive, and goal oriented coaching. Effectiveness wa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: American Journal of Occupational Therapy

سال: 2000

ISSN: 0272-9490

DOI: 10.5014/ajot.54.2.148