Critical pathways at Massachusetts General Hospital

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Critical Care Handbook of the Massachusetts General Hospital

am not really a fan of medical books in general. I usually fi nd them outdated and boring. Th e speed of scientifi c advances and of dissemination of knowledge via modern electronic communication tools does not fi t into the tradi tional process for a book. Not rarely, information delivered in medical textbooks is contradicted by the continuous release of new data. Likewise, the endless gain in...

متن کامل

A most unusual patient at the Massachusetts General Hospital.

This year marks 200 years of patient care at the Massachusetts General Hospital (MGH). In celebration of this milestone, a unique Grand Rounds case is presented. A 450-year-old rotund man admitted 60 times presents with a classic triad of periumbilical pain, bilateral plantar burns, and a frozen scalp. Although this triad may at first strike a cord of familiarity among seasoned clinicians, the ...

متن کامل

Case Records of the Massachusetts General Hospital.

Clinicopathological Conference / HMS Dementia: A Comprehensive Update June 9, 2016, 10:00 a.m., Fairmont Copley Plaza Hotel Dr. M.-Marsel Mesulam and Others PRESENTATION OF CASE A 70-year-old woman was seen in the Memory Disorders outpatient clinic of this hospital because of gradually progressive cognitive difficulties involving word-finding. She was interviewed with the assistance of her daug...

متن کامل

Factor analysis of the Massachusetts General Hospital Hairpulling Scale.

OBJECTIVE We explored the factor structure of the Massachusetts General Hospital Hairpulling Scale (MGH-HPS), a self-report measure for trichotillomania (TTM). METHODS Self-reported hairpullers who responded to an Internet-based survey (N=990) completed the MGH-HPS, demographic items, and other survey instruments. Principal axis exploratory factor analysis with Promax rotation of scores was c...

متن کامل

Massachusetts General Hospital SAFER criteria for clinical trials and research.

M ajor depressive disorder (MDD) is considered a major public health issue related to considerable morbidity and disability. In addition, about half of patients with MDD will respond either partially or not at all to first-line antidepressant monotherapy, despite an adequate dosage and a sufficient duration of treatment. For these patients, there is a clear need to study next-step antidepressan...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Vascular Surgery

سال: 1998

ISSN: 0741-5214

DOI: 10.1016/s0741-5214(98)70179-x