Critical Pathways

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chapter 52. Critical Pathways

Burgeoning concerns regarding patient safety, variable health care quality and increasing health care costs have led to the introduction of clinical management tools that have their origins outside of the traditional health care sector. Primary among these innovations has been the implementation of critical pathways, administrative models that streamline work and production processes. Critical ...

متن کامل

Critical molecular pathways in CLL therapy

Chronic lymphocytic leukemia (CLL), the most frequent type of leukemia in western countries, is characterized by the progressive accumulation in blood, bone marrow and lymphoid tissues of monoclonal B lymphocytes with a characteristic immunophenotype. Despite advances in therapy and improved outcome, in most instances CLL is an incurable disorder. Signaling via the B-cell receptor (BCR), the up...

متن کامل

Critical pathways: the role of pharmacy today and tomorrow.

Critical pathways represent comprehensive management plans that aim to optimize and streamline patient care. Critical pathways have been referred to in the medical literature by a number of different terms, including care path, care map, clinical pathway, critical path of care, case management plan, multidisciplinary action plan, collaborative care track, plan of care, clinical care plans, and ...

متن کامل

The Critical Role of Metabolic Pathways in Aging

Aging is characterized by a deterioration in the maintenance of homeostatic processes over time, leading to functional decline and increased risk for disease and death. The aging process is characterized metabolically by insulin resistance, changes in body composition, and physiological declines in growth hormone (GH), insulin-like growth factor-1 (IGF-1), and sex steroids. Some interventions d...

متن کامل

Critical pathways for smaller hospitals in rural areas.

Critical pathways, developed for utilisation in the health sector, are tools that are increasingly being used to implement co-ordinated patient care. The introduction of critical pathways results in planned progress through an episode of care, whilst optimising health outcomes and minimising resource utilisation. The advantages of implementing critical pathways are increasingly evident, with re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Circulation

سال: 2000

ISSN: 0009-7322,1524-4539

DOI: 10.1161/01.cir.101.4.461