Cut generation for an integrated employee timetabling and production scheduling problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cut generation for an integrated employee timetabling and production scheduling problem

This paper investigates the integration of the employee timetabling and production scheduling problems. At the first level, we manage a classical employee timetabling problem. At the second level, we aim at supplying a feasible production schedule for a set of interruptible tasks with qualification requirements and time-windows. Instead of hierarchically solving these two problems as in the cur...

متن کامل

Cut generation for an employee timetabling problem

Motivated by an industrial application, we study a specific employee timetabling problem. Several investigations are being conducted: a lower bound by Lagrangian relaxation, a heuristic based on a cut generation process and an exact method by Benders decomposition. Experimental results on real and generated instances are reported.

متن کامل

Near optimal and optimal solutions for an integrated employee timetabling and production scheduling problem

This paper deals with integrated employee timetabling and production scheduling problem. At the first level, we have to manage a classical employee timetabling problem. At the second level, we aim at supplying a feasible production schedule for a set of interruptible tasks with qualification requirements and time-windows. Instead of using a hierarchical approach, we try here to integrate the tw...

متن کامل

Solving an integrated employee timetabling and production scheduling problem via hybrid branch-and-bound

We propose exact hybrid methods based on integer linear programming and constraint programming for an integrated employee timetabling and production scheduling problem. Each method we investigate uses a constraint programming (CP) formulation associated with a linear programming (LP) relaxation. Under a CP framework, the LP-relaxation is integrated into a global constraint using in addition red...

متن کامل

Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound

We propose exact hybrid methods based on integer linear programming and constraint programming for an integrated employee timetabling and job-shop scheduling problem. Each method we investigate uses a constraint programming (CP) formulation associated with a linear programming (LP) relaxation. Under a CP framework, the LP-relaxation is integrated into a global constraint using in addition reduc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2010

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2009.03.013