Cyber-Physical Production System (CPPS) decision making duration time impact on manufacturing system performance
نویسندگان
چکیده
منابع مشابه
Intelligent Integrated Manufacturing Decision Making System
In today's highly competitive intellectual environments which force top management to constantly looking for better improvement and making the best decisions in shortest possible time and within limited resources. Managers in manufacturing companies need to have strong capability of adaptation mainly because of the dynamic relationships that must be established between manufacturing units. To a...
متن کاملCyber-Physical System Security and Impact Analysis
Electric power grids have been identified as critical infrastructures. They are increasingly dependent on Information and Communication Technologies (ICTs) for the operation and control of physical facilities. It can be envisioned that on top of the power infrastructure reside ICT layers that are coupled with the electric grids. As the ICT connectivity increases, so does the potential for cyber...
متن کاملperformance of biological system and advanced oxidation processes (aop) treating antibiotic production industrial wastewater
در این مطالعه، عملکرد دو سیستم اکسیداسیون شیمیایی پیشرفته و یک سیستم بیولوژیکی برای حذف آموکسی سیلین در فاضلاب های سنتزیدر غلظت های مشابه با موارد صنعتی مورد بررسی قرار گرفته شدند. مطالعه انجام شده دارای سه بخش متفاوت اکسیداسیون با ازن و اشعه uv، اکسیداسیون با استفاده از نانو فتوکاتالیست tio2 و استفاده از بیوراکتور هوازی لجن فعال با جداکننده های فیزیکی می باشد. در هر بخش، متغیر های متفاوتی متنا...
15 صفحه اولMedical Cyber Physical System
Cyber Physical System (CPS) is collection of different computation component which collaborate with each other in order to control the physical entity. Cyber physical system has a far reaching effect in different area such as aerospace, automotive, chemical processes, civil infrastructure, energy, healthcare, manufacturing, transportation, entertainment, and consumer appliances. CPS in healthca...
متن کاملPerformance Prediction of a Flexible Manufacturing System
The present investigation presents a stochastic model for a flexible manufacturing system consisting of flexible machine, loading/unloading robot and an automated pallethandling device. We consider unreliable flexible manufacturing cell (FMC) wherein machine and robot operate under individual as well as common cause random failures. The pallethandling system is completely reliable. The pallet o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: FME Transactions
سال: 2019
ISSN: 1451-2092,2406-128X
DOI: 10.5937/fmet1904675a