Unleash Stranded Power in Data Centers with Rack Packing
Data center infrastructures are highly underutilized on average. Typically, a data center manager computes the number of servers his facility can host by dividing the total power capacity of each rack by an assigned “peak power rating” for each server. However, this scheme suffers from the weakness of all static provisioning schemes – it does not account for the variability of load on the serve...
متن کاملUnleash Stranded Power in Data Centers with RackPacker
Data center infrastructures are highly underutilized on average. Typically, a data center manager computes the number of servers his facility can host by dividing the total power capacity of each rack by an assigned “peak power rating” for each server. However, this scheme suffers from the weakness of all static provisioning schemes – it does not account for the variability of load on the serve...
متن کاملHow to Harness Your Plant’s Improvement Power
Unless your organization is unique, it’s been under assault over the past fifteen years from intense competitive pressures. In response, you and others have ordered up a veritable alphabet soup of improvement initiatives: QCC, STS, TQC, TQM, SPC, JIT, DOE, ERP — does it ever end? Or you’ve turned to the “non-alphabetized” menu: benchmarking; reengineering; cycle-time reduction; supply chain man...
متن کاملPower Management in Data Centers
U.S. data center energy consumption is expected to double every 5 years, as shown in Fig. 1, at a huge cost both financially and to the environment. Microsoft itself launched two new mega-data centers last year, in Dublin and in Chicago. Sadly, much of the power consumed by these data centers is wasted. As documented in a recent Google study, [2], servers are only busy 20-30% of the time on ave...
متن کاملRobust Unit Commitment with Dispatchable Wind Power
7 The increasing penetration of uncertain generation such as wind and solar in power systems imposes new challenges to the Unit Commitment (UC) problem, one of the most critical tasks in power systems operations. The two most common approaches to address these challenges — stochastic and robust optimization — have drawbacks that restrict their application to real-world systems. This paper demon...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Sustainable Energy
سال: 2017
ISSN: 1949-3029,1949-3037
DOI: 10.1109/tste.2016.2593607