DEALING WITH UNCERTAINTY ABOUT ITEM PARAMETERS: EXPECTED RESPONSE FUNCTIONS

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Linking Item Response Model Parameters

With a few exceptions, the problem of linking item response model parameters from different item calibrations has been conceptualized as an instance of the problem of test equating scores on different test forms. This paper argues, however, that the use of item response models does not require any test score equating. Instead, it involves the necessity of parameter linking due to a fundamental ...

متن کامل

#510 - Dealing With Uncertainty

The problem of uncertainty has plagued environmental regulation from the beginning. The common practice in the U.S. is to ignore or deny the existence of uncertainty, or to apply arbitrary numerical "fudge factors," then to proceed as if everything were known with a high degree of certainty. For example, a deadly amount of a chemical may be determined for mice; then a fudge factor of 100 or 100...

متن کامل

Dealing with Uncertainty Together

material presented is the result of a collaborative research task, drawing upon studies performed by participants in IEA-ETSAP/Annex VI and guided by the ETSAP Executive Committee. The views and opinions expressed herein do not necessarily state or reflect those of Governments of any IEA member state, or any agency, contractor or subcontractor thereof; nor those of the International Energy Agency.

متن کامل

Uncertainty andMethods for Dealing with Uncertainty

In other words then, if a machine is expected to be infallible , it cannot also be intelligent. Abstract In this note we introduce a proposal to provide a mechanism to deal with uncertainty in a PROLOG environment. The intent is that such a mechanism will enable experimental and comparative research on applications which need to deal with uncertainty. Such research is needed since the variety o...

متن کامل

Dealing with expected and unexpected obstacles

18 The two lines after the command line are GETFOL output. They tell us that, in order to perform reeection up, the system enters the context FLYING and then it returns back to C. We can now derive ist(NFP1,WS1) by implication elimination. Finally we enter context WS1 and prove what we want by reeection down. C@GLM:: SWITCHCONTEXT WS1; You are now using context: WS1 You are switching to a proof...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ETS Research Report Series

سال: 1994

ISSN: 2330-8516

DOI: 10.1002/j.2333-8504.1994.tb01601.x