Decommissioning Plans for Fixed Offshore Platforms: A Brief Revision

نویسندگان

چکیده

Brazil began to explore its seas in the 60’s of XX Century looking for petroleum. This journey Northeast and first oil field produced offshore was Guaricema Field, State Sergipe. During 70’s, Petrobrás found Campos Basin, between States Espírito Santo Rio de Janeiro, that became most important province until discovery Pre-Salt province, Santos Basin. As these fields are producing a long time, many them already completely depleted or their production is way be not commercial anymore, facilities need decommissioned. review decommissioning practices fixed platforms carried out worldwide has focus on removal topside with special vessels designed this purpose conventional methods (crane + barge). It will show benefits using specialised heavy lift remove topsides move it shore dismantling / recycling reuse disposal. The cases study were successful projects North Sea: Brent B/D, Valhall QP, Viking, Curlew, Eider A, Golden Eye Leman, Iwaki-Oki, Halfweg Q1, Yme Ninian North.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluating alternatives for decommissioning California's offshore oil and gas platforms.

This paper introduces a series of 6 additional papers in this issue that describe an in-depth analysis of options for decommissioning oil and gas platforms offshore southern California. Although current leases require lessees in both state and federal waters to completely remove all production facilities and restore the seafloor to its pre-platform condition, other options have emerged since th...

متن کامل

A multi-attribute decision analysis for decommissioning offshore oil and gas platforms.

The 27 oil and gas platforms off the coast of southern California are reaching the end of their economic lives. Because their decommissioning involves large costs and potential environmental impacts, this became an issue of public controversy. As part of a larger policy analysis conducted for the State of California, we implemented a decision analysis as a software tool (PLATFORM) to clarify an...

متن کامل

Structural System Reliability Framework For Fixed Offshore Platforms

The main objective of this project is to develop a generic framework which will set the basis for achieving more consistent system reliability assessments. The main steps involved in a system reliability assessment, together with the key technical and philosophical issues, will be identified and examined. Their interrelations and relative significance will be assessed in order to link them toge...

متن کامل

Reliability Based Assessment of Existing Fixed Offshore Platforms Located in the Persian Gulf

This paper presents a detailed structural reliability procedure in order to achieve an acceptable safety margin for template type offshore platforms located in the Persian Gulf. Probability of failure in this study is calculated by considering the cumulative effects of all levels of wave loading during the lifetime of the structure and uncertainties associated with soil, material properties, co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Asian Journal of Engineering and Technology

سال: 2021

ISSN: ['2321-2462']

DOI: https://doi.org/10.24203/ajet.v9i3.6292