Delay Analysis of a HOL Priority Queue

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Delay Analysis of a HOL Priority Queue

Priority scheduling for packets is a hot topic, as interactive (voice,video) services are being integrated in existing data networks. In this paper, we consider a discrete-time queueing system with a non-preemptive (or Head-Of-the-Line) priority scheduling discipline and a general number of priority classes. Packets of variable length arrive in the queueing system. We derive expressions for the...

متن کامل

A Discrete-Time HOL Priority Queue with Multiple Traffic Classes

Priority scheduling for packets is a hot topic, as interactive (voice,video) services are being integrated in existing data networks. In this paper, we consider a discrete-time queueing system with nonpreemptive (or Head-Of-the-Line) priority scheduling and a general number of priority classes. Packets of variable length arrive in the queueing system. We derive expressions for the probability g...

متن کامل

Delay Analysis of a Discrete-Time Non-Preemptive Priority Queue with Priority Jumps

In this paper, we consider a discrete-time non-preemptive priority queueing model with priority jumps. Two classes, real-time (high priority) and non-real time (low priority), of traffic will be considered with providing jumps from lower priority traffic to the queue of high priority traffic. We derive expressions for the joint probability generating function of the system contents of the high ...

متن کامل

A Finite Capacity Priority Queue with Discouragement

In this paper we report on a study of a two level preemptive priority queue with balking and reneging for lower priority level. The inter-arrival and the service times for both levels follow exponential distribution. We use a finite difference equation approach for solving the balance equations of the governing queuing model whose states are described by functions of one independent variable. H...

متن کامل

Delay Analysis of a Place Reservation Queue

Modern communication networks have to support an increasingly diverse range of applications, each bearing their own particular set of Quality of Service (QoS) requirements. Realtime applications (e.g. multimedia streaming, telephony, gaming, ...) are characterized by hard delay requirements: the mean delay and the delay jitter of the data packets should typically be kept minimal. For non-real-t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Telecommunication Systems

سال: 2005

ISSN: 1018-4864,1572-9451

DOI: 10.1007/s11235-005-4317-0