Delay analysis of a two-class batch-service queue with class-dependent variable server capacity

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

System Occupancy of a Two-Class Batch-Service Queue with Class-Dependent Variable Server Capacity

Due to their wide area of applications, queueing models with batch service, where the server can process several customers simultaneously, have been studied frequently. An important characteristic of such batch-service systems is the size of a batch, that is the number of customers that are processed simultaneously. In this paper, we analyse a two-class batch-service queueing model with variabl...

متن کامل

FINITE POPULATION SINGLE SERVER BATCH SERVICE QUEUE WITH COMPULSORY SERVER VACATION

A single server finite population queueing model with compulsory server vacation and with fixed batch service has been considered. For this model the system steady state probabilities are obtained. Some performance measures are calculated and numerical examples are also given.  

متن کامل

Single Server Bulk Queue with Service Interruption, Two Phase Repairs and State Dependent Rates

This paper reports a study on a single server queue with bulk arrival and bulk service patterns wherein the incoming traffic depends on the state of the server which may be in operating or breakdown state. The repair of the breakdown server is performed in two phases. The operating duration of server, repair duration of both phases of repairing as well as job's inter-arrival times and service t...

متن کامل

Unreliable Server Mx/G/1 Queue with Loss-delay, Balking and Second Optional Service

This investigation deals with MX/G/1 queueing model with setup, bulk- arrival, loss-delay and balking. The provision of second optional service apart from essential service by an unreliable server is taken into consideration. We assume that the delay customers join the queue when server is busy whereas loss customers depart from the system. After receiving the essential service, the customers m...

متن کامل

Analysis of finite-buffer discrete-time batch-service queue with batch-size-dependent service

Over the last two decades there has been considerable growth in digital communication systems which operate on a slotted system. In several applications, transmission of packets over the network takes place in batches of varying size, and transmission time depends upon the size of the batch. Performance modelling of these systems is usually done using discrete-time queues. In view of this, we c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Methods of Operations Research

سال: 2018

ISSN: 1432-2994,1432-5217

DOI: 10.1007/s00186-017-0627-8