Delay Analysis of Car-to-Car Reliable Data Delivery Strategies Based on Data Mulling with Network Coding
نویسندگان
چکیده
منابع مشابه
Delay Analysis of Car-to-Car Reliable Data Delivery Strategies Based on Data Mulling with Network Coding
Vehicular ad hoc networks (VANET) aims to enhance vehicle navigation safety by providing an early warning system: any chance of accidents is informed through the wireless communication between vehicles. For the warning system to work, it is crucial that safety messages be reliably delivered to the target vehicles in a timely manner and thus reliable and timely data dissemination service is the ...
متن کاملAnalysis of Car-to-Car Beaconing with Network Coding
Lack of updated information due to a high beacon loss rate is a key challenge in car-to-car beaconing strategies. One potential solution for this issue is to re-broadcast lost beacons. However, the repeated dissemination of each lost beacon is infeasible due to the limited bandwidth of wireless channels. To overcome this limitation, network coding is a promising technique, through which a node ...
متن کاملthe clustering and classification data mining techniques in insurance fraud detection:the case of iranian car insurance
با توجه به گسترش روز افزون تقلب در حوزه بیمه به خصوص در بخش بیمه اتومبیل و تبعات منفی آن برای شرکت های بیمه، به کارگیری روش های مناسب و کارآمد به منظور شناسایی و کشف تقلب در این حوزه امری ضروری است. درک الگوی موجود در داده های مربوط به مطالبات گزارش شده گذشته می تواند در کشف واقعی یا غیرواقعی بودن ادعای خسارت، مفید باشد. یکی از متداول ترین و پرکاربردترین راه های کشف الگوی داده ها استفاده از ر...
Evaluating Organizational Performance Based on Safety Management Using Data Envelopment Analysis; Case Study: Isfahan Car Industry
Occupational accidents severely deteriorate human capital, and hence negatively affect the productivity and competitiveness. But despite these negative points, there are still deficiencies in safety management performance and indicators. Therefore the safety issue needs an active management. For this reason, the writer has proposed an approach to evaluate organizations based on safety managemen...
متن کاملEvaluating Organizational Performance Based on Safety Management Using Data Envelopment Analysis; Case Study: Isfahan Car Industry
Occupational accidents severely deteriorate human capital, and hence negatively affect the productivity and competitiveness. But despite these negative points, there are still deficiencies in safety management performance and indicators. Therefore the safety issue needs an active management. For this reason, the writer has proposed an approach to evaluate organizations based on safety managemen...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEICE Transactions on Information and Systems
سال: 2008
ISSN: 0916-8532,1745-1361
DOI: 10.1093/ietisy/e91-d.10.2524