Delay Analysis of DSDV Protocol using NS 2.34
نویسندگان
چکیده
منابع مشابه
Destination-sequenced distance vector (DSDV) routing protocol implementation in ns-3
Routing protocols are a critical aspect to performance in mobile wireless networks. The development of new protocols requires testing against well-known protocols in various simulation environments. In this paper we present an overview of several well-known MANET routing protocols and the implementation details of the DSDV routing protocol in the ns-3 network simulator. We analyse DSDV routing ...
متن کاملanalysis of ruin probability for insurance companies using markov chain
در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...
15 صفحه اولComparison and Study of AOMDV and DSDV Routing Protocols in MANET Using NS-2
A mobile ad hoc network (MANET) is a collection of wireless mobile nodes communicating with each other using multi-hop wireless. One of the main challenges of MANET is the design of robust routing algorithms that adapt to the frequent and randomly changing network topology. A variety of routing protocols have been proposed and several of them have been extensively simulated or implemented as we...
متن کاملPERFORMANCE METRIC COMPARISON OF AODV AND DSDV ROUTING PROTOCOLS IN MANETs USING NS-2
Efficient routing protocols can provide significant benefits to mobile ad hoc networks in terms of both performance and reliability. Mobile Ad-hoc Network (MANET) is an infrastructure less and decentralized network which need a robust dynamic routing protocol. Many routing protocols for such networks have been proposed so far. Amongst the most popular ones are Dynamic Source Routing (DSR), Ad-h...
متن کاملPerformance Analysis of AODV, CBRP, DSDV and DSR MANET Routing Protocol using NS2 Simulation
A Mobile Ad-hoc Network (MANET) is a collection of multi-hop wireless mobile nodes among which the communication is carried out without any centralized control or fixed infrastructure. MANET is a self-organized, self-configurable network having no infrastructure, and in which the mobile nodes move arbitrarily. The wireless link in the network are highly error prone and can go down frequently du...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computer Applications
سال: 2016
ISSN: 0975-8887
DOI: 10.5120/ijca2016907807