Delay Analysis of Small-scale Roundabouts Using VISSIM

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Capacity and Delay Estimation for Roundabouts Using Conflict Theory

To estimate the capacity of roundabouts more accurately, the priority rank of each stream is determined through the classification technique given in the Highway Capacity Manual 2010 (HCM2010), which is based on macroscopical analysis of the relationship between entry flow and circulating flow. Then a conflict matrix is established using the additive conflict flow method and by considering the ...

متن کامل

Comparison of SimTraffic and VISSIM Microscopic Traffic Simulation Tools in Modeling Roundabouts

SimTraffic and VISSIM are two microscopic traffic simulation tools that are capable of modeling arterial roads with signalized intersections and roundabouts. This study compares the performance of the two simulation tools in modeling dual lane and triple lane roundabouts under different scenarios such as traffic volume, proportion of left turning movement, and proportion of trucks in the traffi...

متن کامل

analysis of ruin probability for insurance companies using markov chain

در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...

15 صفحه اول

Treatment of small scale gold mining wastewater using pilot-scale sedimentation and Cocopeat filter bed system

The use of amalgamation process to recover gold from mined ores by the small-scale gold miners in the Philippines and other developing countries produces and dispose of untreated wastewater to the receiving water bodies. In this study, a field-scale filter bed system was constructed to treat heavy metal metal-laden wastewater collected from small-scale gold mining site in Paracale, Camarines No...

متن کامل

Small Scale Effect on the Buckling Analysis of a Double-Walled Carbon Nanotube under External Radial Pressure Using Energy Method

In this paper, using energy method, small scale effects on the buckling analysis of a double-walled carbon nanotube (DWCNT) under external radial pressure is studied. The constitutive equations derived for a DWCNT using the nonlocal theory of elasticity which Eringen are presented for the first time. By minimizing the second variation of the total energy for a DWCNT, hence, the value of the non...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Korean Society of Transportation

سال: 2017

ISSN: 1229-1366

DOI: 10.7470/jkst.2017.35.5.385