Delay Analysis on-chip VLSI Interconnect using Gamma Distribution Function

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Delay Analysis on-chip VLSI Interconnect using Gamma Distribution Function

Moments of the impulse response are widely used for interconnect delay analysis, from the explicit Elmore delay (the first moment of the impulse response) expression, to moment matching methods which creates reduced order trans-impedance and transfer function approximations. However, the Elmore delay is fast becoming ineffective for deep submicron technologies, and reduced order transfer functi...

متن کامل

Delay Analysis on-chip VLSI Interconnect using Gamma Distribution Function

Moments of the impulse response are widely used for interconnect delay analysis, from the explicit Elmore delay (the first moment of the impulse response) expression, to moment matching methods which creates reduced order trans-impedance and transfer function approximations. However, the Elmore delay is fast becoming ineffective for deep submicron technologies, and reduced order transfer functi...

متن کامل

Accurate Crosstalk Analysis for RLC On-Chip VLSI Interconnect

This work proposes an accurate crosstalk noise estimation method in the presence of multiple RLC lines for the use in design automation tools. This method correctly models the loading effects of non switching aggressors and aggressor tree branches using resistive shielding effect and realistic exponential input waveforms. Noise peak and width expressions have been derived. The results obtained ...

متن کامل

Closed Form Expressions for Delay to Ramp Inputs for On-Chip VLSI RC Interconnect

In high speed digital integrated circuits, interconnects delay can be significant and should be included for accurate analysis. Delay analysis for interconnect has been done widely by using moments of the impulse response, from the explicit Elmore delay (the first moment of the impulse response) expression, to moment matching methods which creates reduced order trans impedance and transfer func...

متن کامل

Delay Analysis in Carbon Nanotube Bundle Interconnect For VLSI Design

This paper proposes to study the performance of carbon nanotube bundle in terms of delay as a VLSI interconnect at 32nm technology node. Output waveform and 90% propagation delay are analytically determined and compared with SPICE simulation result. Alpha power law model is used for representing the transistors of CMOS driver. SPICE simulation result reveals that delay increases with increase i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Computer Applications

سال: 2010

ISSN: 0975-8887

DOI: 10.5120/81-176