Delay and Cost Overrun in Infrastructure Projects in Jordan

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects

Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...

متن کامل

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

prediction of ignition delay period in d.i diesel engines

a semi-empirical mathematical model for predicting physical part of ignition delay period in the combustion of direct - injection diesel engines with swirl is developed . this model based on a single droplet evaporation model . the governing equations , namely , equations of droplet motion , heat and mass transfer were solved simultaneously using a rung-kutta step by step unmerical method . the...

Inclusion of Health in Environmental Impact Assessment of Major Transport Infrastructure Projects in Vietnam

Background Infrastructure spending, especially in the transport sector, is expected to increase rapidly in Vietnam. This boost in transportation investment impacts health. Environmental impact assessments (EIAs) are essential tools for decision-making to reduce and mitigate anticipated impacts of development projects, and integration of health assessment as an essential part of the EIA process ...

متن کامل

manipulation in dubbing and subtitling

پژوهش حاضر در چارچوب مکتب دستکاری قرار گرفت و با استفاده از تقسیم بندی دوکات (2007) از شیوه های دستکاری، به دنبال یافتن پاسخ برای پرسش های زیر بود: 1-رایج ترین شیوه دستکاری در دوبله فیلم ها کدام است؟ 2-رایج ترین شیوه دستکاری در زیرنویس فیلم ها کدام است؟ 3-دستکاری در دوبله فیلم ها رایج تر است یا در زیرنویس آن ها؟ این پژوهش از نوع تحقیقات توصیفی- مقایسه ای و پیکره ای می باشد. پیکره تحقیق شا...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Engineering

سال: 2017

ISSN: 1877-7058

DOI: 10.1016/j.proeng.2017.03.105