Delay and cost overrun in road construction projects in Jordan
نویسندگان
چکیده
منابع مشابه
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...
متن کاملAnalysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کاملConceptual Cost Estimate of Road Construction Projects in Saudi Arabia
This study aims at developing regression models to predict the total construction cost of a road project in the early phases. The models were developed based on 52 sets of data collected in Saudi Arabia. The projects were implemented during 2011. The procedure used resulted in the formulation of 5 regression models; 2 of them include bid quantities of the major construction activities as indepe...
متن کاملAnalyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...
متن کاملDelays in construction projects: The case of Jordan
The construction industry is a major player in the economy, generating both, employment and wealth. However many projects experience extensive delays and thereby exceed initial time and cost estimates. A host of causes of construction delays in residential projects were identified and classified according to Drewin’s Open Conversion System. The most common causes were evaluated by using both, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Engineering & Technology
سال: 2015
ISSN: 2227-524X
DOI: 10.14419/ijet.v4i2.4409