Design and Optimization of Plant Layout through Value Stream Mapping

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Extending value stream mapping through waste definition beyond customer perspective

Value stream mapping (VSM) is one of the several Lean practices, which has recently attracted interest in the software engineering community. In other contexts (such as military, health and production), VSM has achieved considerable improvements in processes and products. The goal is to capitalize on these benefits in the software intensive product development context. The primary contribution ...

متن کامل

Architectural Layout Design Optimization

This article presents an optimization model of the quantifiable aspects of architectural floorplan layout design, and a companion article presents a method for integrating mathematical optimization and subjective decision making during conceptual design. The model presented here offers a new approach to floorplan layout optimization that takes advantage of the efficiency of gradient-based algor...

متن کامل

Value Stream Mapping and Improved Cell Layout in an Oilfield Services

This research explores potential improvements in efficiency through improved cell layout and value stream mapping. Analysis of cell layout led to significant reductions in material handling and operator movement along with reduction in cell area thereby improving overall productivity. Value stream mapping of protector assembly, one of the company's products, identified hidden inefficiencies in ...

متن کامل

Improving Wait Times to Care for Individuals with Multimorbidities and Complex Conditions Using Value Stream Mapping

Background Recognizing the significant impact of wait times for care for individuals with complex chronic conditions, we applied a LEAN methodology, namely – an adaptation of Value Stream Mapping (VSM) to meet the needs of people with multiple chronic conditions and to improve wait times without additional resources or funding.   Methods Over an 18-month time period, staff applied a patient-cen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology

سال: 2018

ISSN: 2321-9653

DOI: 10.22214/ijraset.2018.7045