Design and Signal Delay Analysis of Spinning Missile Electric Rudder Control System
نویسندگان
چکیده
منابع مشابه
development and implementation of an optimized control strategy for induction machine in an electric vehicle
in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...
15 صفحه اولsimulation and design of electronic processing circuit for restaurants e-procurement system
the poor orientation of the restaurants toward the information technology has yet many unsolved issues in regards to the customers. one of these problems which lead the appeal list of later, and have a negative impact on the prestige of the restaurant is the case when the later does not respond on time to the customers’ needs, and which causes their dissatisfaction. this issue is really sensiti...
15 صفحه اولControl System Design and Fault-Ride-through Performance Analysis of Grid-Connected Microturbine Generation System
In recent years, microturbines as one the distributed generation sources have widly used. This paper investigates the control structure of the microturbine and analyzes its performance in grid-connected mode. In this way, first, the mechanical model of the microturbine is presented. Then, the electrical structure of the microturbine, consisting of permanent magnet synchronous generator (PMSG) ...
متن کاملAgile Missile Autopilot Design Using Nonlinear Backstepping Control with Time-Delay Adaptation
This paper deals with a nonlinear adaptive autopilot design for agile missile systems. In advance of the autopilot design, an investigation of the agile turn maneuver, based on the trajectory optimization, is performed to determine state behaviors during the agile turn phase. This investigation shows that there exist highly nonlinear, rapidly changing dynamics and aerodynamic uncertainties. To ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Earth and Environmental Science
سال: 2020
ISSN: 1755-1315
DOI: 10.1088/1755-1315/440/3/032037