Design Structure Matrix and Project Management: bibliometric analysis
نویسندگان
چکیده
منابع مشابه
langauge needs analysis of undergraduate business management and economics students
the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...
15 صفحه اولProduct configuration analysis with design structure matrix
Purpose – Product configurator is a sales and production-planning tool that helps to transform customer requirements into bills-of-materials, lists of features and cost estimations. The purpose of this paper is to introduce a method of how to analyse sales configuration models by using a design structure matrix (DSM) tool. By applying the DSM techniques, the sales configuration managers may seq...
متن کاملComparative analysis of design/build and design/bid/build project delivery systems in Lebanon
Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...
متن کاملAnalysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کاملLean Design Management and Scheduling View project
Much attention has been placed on measuring performance of activity completion in Lean literature, using techniques such as Percentage of Planned Activities Completed (PPC). Originally intended as one component of measuring plan execution, along with measures of Planned Productivity, PPC has been extensively researched but Planned Productivity has been neglected. Using a lean methodology based ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Product Management & Development
سال: 2017
ISSN: 2237-5228
DOI: 10.4322/pmd.2017.008