Design–construction interface problems in large building construction projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

Exploring Interface Problems in Taiwan’s Construction Projects Using Structural Equation Modeling

Construction projects are complex systems that inherently contain complex interface problems. This study explored the root causes of interface problems in construction projects using structural equation modeling. This technique is a systematic approach that combines factor analysis and path analysis to investigate the causal relationships among multidimensional factors. The literature on constr...

متن کامل

reliabilty assessment of conceptual cost estimates for building construction projects

in the early stages of a construction project, the reliability and accuracy of conceptual cost estimates are major concerns for clients and cost engineers. previous studies applied scoring methods and established common rules or mathematical methods to assess the quality of cost estimates. however, those approaches have some limitations in adapting to real-world projects or require understandin...

متن کامل

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Merging Building Automation Network Design and IFC 2x Construction Projects

Currently, different design tools and databases are used for building automation networks and construction projects. Effort (design time, tools) can be reduced if these two design spaces can be merged. In this paper an approach for the integration of building automation network design in IFC 2x is introduced. Based on the resulting model, existing tools are to enhance in order to accomplish a h...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Construction Management

سال: 2016

ISSN: 1562-3599,2331-2327

DOI: 10.1080/15623599.2016.1187248