Detailed long‐term hydro‐thermal scheduling for expansion planning in the Nordic power system
نویسندگان
چکیده
منابع مشابه
analysis of power in the network society
اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...
15 صفحه اولExpansion Planning for Electric Power Systems
Electricity is so basic to the world economy that certain electricity indices are used to express a country's economic standing (consumption or production of electricity per capita) and the standard of living enjoyed by a people (per capita electricity consumption in the domestic sector). Moreover, electricity supply has special characteristics which make the service unique as compared to other...
متن کاملAccelerating the Composite Power System Planning by Benders Decomposition
This paper presents an application of Benders decomposition to deal with the complexities in the simultaneous Generation Expansion Planning (GEP) and Transmission Expansion Planning (TEP). Unlike the power system operation fields of study, the power system planning methods are not expected to be fast. However, it is always preferable to speed up computations to provide more analysis options for...
متن کاملScheduling security constraint unit commitment for power system including stochastic wind power generation
This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...
متن کاملA Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem
The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IET Generation, Transmission & Distribution
سال: 2017
ISSN: 1751-8695,1751-8695
DOI: 10.1049/iet-gtd.2017.0903