Developing a Project and Program Management Capability Assessment System for the Korean Construction Management Firms
نویسندگان
چکیده
منابع مشابه
Construction Management Risk System (CMRS) for Construction Management (CM) Firms
After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM) firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence...
متن کاملdeveloping a pattern based on speech acts and language functions for developing materials for the course “ the study of islamic texts translation”
هدف پژوهش حاضر ارائه ی الگویی بر اساس کنش گفتار و کارکرد زبان برای تدوین مطالب درس "بررسی آثار ترجمه شده ی اسلامی" می باشد. در الگوی جدید، جهت تدوین مطالب بهتر و جذاب تر، بر خلاف کتاب-های موجود، از مدل های سطوح گفتارِ آستین (1962)، گروه بندی عملکردهای گفتارِ سرل (1976) و کارکرد زبانیِ هالیدی (1978) بهره جسته شده است. برای این منظور، 57 آیه ی شریفه، به صورت تصادفی از بخش-های مختلف قرآن انتخاب گردید...
15 صفحه اولDesertification risk assessment and management program
Risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. The present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of Golestan Province in Iran. Desertification rate was obtained using the Iranian model of desertification potential assessment. Since...
متن کاملCrisis Management Model in the Petroleum Firms System
In recent decades, energy companies have been thinking about remediation and recruitment of new human resources. The new wave of hiring has had both positive and negative effects. Negative effects (such as over-recruitment and crowding in companies, rising costs of human resources, etc.) have caused a crisis in some energy companies. The purpose of this study was to present a model for crisis m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Korean Journal of Construction Engineering and Management
سال: 2015
ISSN: 2005-6095
DOI: 10.6106/kjcem.2015.16.1.003